Pramac, we are the energy generation!

Pramac

Power solutions for a hotel in the Ivory Coast

Abidjan

PROJECT

PRAMAC has been chosen to provide backup power for the new Moovenpick hotel located in the heart of Abidjan's business center (Ivory Coast). Being the groups located next to meeting rooms, the generators needed to be fitted in a limited space and ensure a very low-noise level. PRAMAC offered a complete solution with 2 groups of 875 KVA coupling automatically in the event of peak loads, an external tank and its fittings, a tailor-made exhaust system and specific acoustic treatment for the installation. PRAMAC followed the project from the production to the commissioning of the units in Abidjan.

KEY FEATURES

​​​​ GCW875P MPP
• Power LTP 899 kVA
• Power PRP 802 kVA
• Frequency 50 Hz
• Tension 400 V
• Engine PERKINS 4006-23TAG3A
• Alternator MECCALTE ECO43 1S
• Incorporated fuel tank of 500 liters
• Electric panel according French standard